How can we help?
Search for answers or browse our knowledge base.
New commercial tap applications
We will need the following to start your project:
- Completed commercial tap application. Download and complete the PDF document below.
- County-approved 2’ x 3’ hard copy. Deliver to 20141 Schiel Rd, Attn: Commercial Taps, Cypress, TX 77433. If not provided, we will print in office and $15.00 per page will be added to the final tap quote.
- County approved civil drawings in electronic (PDF) form, including but not limited to:
- Cover Sheet
- Express Review Sheet
- Utility Plan
- Traffic Control
- Storm utility / drainage plans
- “No objection letter” from MUD engineer
- Capacity letter from MUD engineer (if applicable)
- Site contact information including name and phone number for onsite review of construction
Essential information to keep in mind
- Once all documents have been received, we will need to field verify the current condition to ensure we provide a proper tap quote. Please be patient, this does take some time to schedule and complete depending on the current workload.
- If a meter is needed in the meantime, we do offer temporary meter rentals.
- Once payment is received, installation time frame is approximately 4-6 weeks. With bond and permit, the time could be a little longer.
- Please place a stake in the ground marking the easement for the meter location
Title | Size | Download |
---|---|---|
Application for Commercial Service | 175.63 KB | Download |